Executive Committee Meeting
Revised Agenda 

Meeting #:#9/18
Date:
Time:
-
Location:
HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN

MAJOR PERMIT APPLICATIONS 11.1 - 11.10 - REGULAR – FOR APPROVAL

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area, extensive modifications to the landscape, major infrastructure projects, applications requiring specific conditions and permissions that extend beyond two years.

CITY OF BRAMPTON

To construct, reconstruct, erect or place a building or structure, temporarily or permanently place, dump or remove any material originating on the site or elsewhere on Main Street from Nelson Street East to Wellington Street and on Queen Street from Mill Street South to Chapel Street, in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by City of Brampton. The purpose is to reconstruct and streetscape around the historic “Four Corners” of Downtown Brampton from Mill Street South to Chapel Street on Queen Street and from Nelson Street East to Wellington Street on Main Street in the City of Brampton. The streetscaping proposal includes implementing a strategic green infrastructure plan with low-impact-development (LID) stormwater management measures and a resilient urban tree canopy planting plan. The green infrastructure strategy will improve both urban stormwater management and biodiversity, as well as mitigate urban heat stresses and improve the public realm in the City's downtown core. No in-water works are proposed as part of this project.

CITY OF MARKHAM

To site grade on (22 River Bend Road), in the City of Markham, Rouge River Watershed. The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed to facilitate the site alteration and restoration of the slope located at the rear of 22 River Bend Road, Markham. The works also consist of the demolition/removal of an existing dwelling and several ancillary structures (i.e. stairs, retaining walls and deck etc.) on the subject lands.

To site grade on (24 River Bend Road), in the City of Markham, Rouge River Watershed. The purpose is to undertake works within TRCA's Regulated area of the Rouge River Watershed to facilitate the site alteration and restoration of the slope located at the rear of 24 River Bend Road, Markham. The works also consist of the demolition/removal of an existing dwelling and several ancillary structures (i.e. swimming pool and sheds etc.) on the subject lands.

To construct, reconstruct, erect or place a building or structure on Lot 11, Concession 3, (2830 Highway 7 East), in the City of Markham, Rouge River Watershed as located on the property owned by The Eastern District of the Canadian Missionary Alliance in Canada. The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in order to facilitate the construction of a two-storey addition (275 square metres in size) to an existing church at 2830 Highway 7 East, Markham. The works also consist of the removal of an existing shed, minor site alteration, municipal servicing improvements, hardscaping and the construction of several ancillary structures (i.e. Infiltration gallery, refuse shed, bike rack and concrete pads).

CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)

To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on (Taylor Creek Park - near Don Mills Road and the Don Valley Parkway), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Hydro One Networks and TRCA (easement agreement). The purpose is to implement the first stage of the Don River and Central Waterfront project which involves the construction of a twenty three (23.4) m diameter stormwater shaft in Coxwell Ravine Park, just east of the Don Valley Parkway in the City of Toronto. This shaft is one of five shafts proposed as part of a comprehensive program to greatly reduce combined sewer overflows (CSOs) flowing into the Don River.  The shaft will be constructed from the ground surface to connect to the 6.3m diameter tunnel approximately fifty one (51) meters below ground surface. The warm water construction timing window of July 1 to March 31 will apply to this proposal.

To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on, (21 Redway Road near Millwood Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to implement the first stage of the Don River and Central Waterfront project which involves the construction of a twenty one (21.4) m diameter stormwater shaft near the North Toronto Treatment Plant just off Redway Road, in the City of Toronto. This shaft is one of five shafts proposed as part of a comprehensive program to greatly reduce combined sewer overflows (CSOs) flowing into the Don River. This shaft will be located adjacent to the Don River, just north of the treatment plant complex. The shaft will be constructed from the ground surface to connect to the 6.3m diameter Lower Don/Coxwell tunnel approximately fifty (50.4) meters below ground surface. The warm water construction timing window of July 1 to March 31 will apply to this proposal.

CITY OF VAUGHAN

REGIONAL MUNICIPALITY OF YORK
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on east side of Highway 7 at Highway 400 interchange, in the City of Vaughan, Don River Watershed as located on the property owned by Ministry of Transportation. The purpose is to undertake reconstruction of the Highway 400 and Highway 7 on and off ramps and culvert extension work east of the Highway 7 and Highway 400 interchange.  The works will include, repaving and widening of Highway 7 to accommodate rearrangement of lanes, installation of multi-use path and raised bike lanes, relocation of northern end of the S-E/W ramp approximately 60 m to the east, realignment of approximately 240 m of Black Creek Tributary in association with the new culvert (C8) installation, realignment of the E-N ramp.  The works are associated with the VIVA Bus Rapid Transit (BRT) project.  The warmwater construction timing window will be applied to this project.

TOWN OF RICHMOND HILL

To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, interfere with a wetland and alter a watercourse on Lot 31, 32, Concession 2, (19th Avenue from Leslie Street to 350m west of Leslie Street), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by North Leslie Watermain Trustee Inc. The purpose is to undertake Phase 2 works of the North Leslie External Spine Servicing Network (ESSN) along 19th Avenue, consisting of the installation of a 300mm diameter PVC watermain along 19th Avenue from approximately 750 metres west of Leslie Street, extending approximately 400 metres westward within the existing York Region right-of-way.  The proposed works includes open cut as well as trenchless technologies (HDD) to cross the Rouge River Tributary 2-M.

To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 28, 29, Concession 2, (Leslie Street from Bawden Drive (870m south of 19th Avenue) to 300m North of 19th Avenue), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by North Leslie Watermain Trustee Inc. The purpose is to undertake Phase 2 works on the North Leslie External Spine Servicing Network (ESSN) along Leslie Street, consisting of the installation of a 500mm diameter HDPE watermain from Bawden Drive (870 metres south of 19th Avenue) and extending northward to 300 metres north of 19th Avenue under Leslie Street.  These works will provide servicing to the various draft approved subdivisions in the North Leslie community.  Phase 2 includes the regulated area identified as ESSN Sections PP10 which is subject to this permit.   The proposed works includes open cut as well as trenchless technologies (HDD) to cross the Rough River Tributary 2-M.

To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Lot 25, Concession 2, (Elgin Mills Road East West of Melbourne Drive), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by North Leslie Watermain Trustee Inc. The purpose is to undertake Phase 2 works of the North Leslie External Spine Servicing Network (ESSN) consisting of the installation of a 300mm diameter PVC watermain and a 375 diameter PVC sanitary sewer along Elgin Mills Road from 130 metres west of Melbourne Drive to Melbourne Drive, located in an easement across private landholdings as well as within the existing urbanized section of the York Region right-of-way.  The proposed works are located within TRCA Regulated areas of Tributaries 3-M and 0-1 of the North Leslie Secondary Plan area.  The works will utilize a combination of open cut as well as trenchless technologies (HDD).

Delegated Permits are processed by Planning and Development Division staff, authorized by designated staff appointed as Enforcement Officers by the Board of Directors and received monthly by the Executive Committee. Delegated permits are categorized as standard, routine infrastructure works, emergency infrastructure works, minor works and permits after the fact/resolution of violations.  Standard Permits are non-complex permissions consistent with TRCA approved policies and procedures and issued for a time period of two years or less.

STANDARD DELEGATED PERMITS FOR RECEIPT – STAFF APPROVED AND ISSUED (Page 55)

PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS FOR RECEIPT – STAFF APPROVED AND ISSUED (Page 69)

MINOR WORKS LETTER OF APPROVAL FOR RECEIPT – STAFF APPROVED AND ISSUED (Page 71)

PERMITS AFTER THE FACT / RESOLUTION OF VIOLATIONS – STAFF APPROVED AND ISSUED (Page 78)

CITY OF VAUGHAN

To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Part Lot 6, 7, Concession 5, (Part of 100 Edgeley Boulevard (a formal address will be obtained in the future)), in the City of Vaughan, Humber River Watershed as located on the property owned by First Vaughan Investments Limited. The purpose is to undertake works within TRCA’s Regulated Area of the Humber River Watershed in order to facilitate site alteration and grading for the construction of Applewood Crescent, connecting Portage Parkway and Highway 7 (North – South) and an extension of Apple Mill Road to the West to connect with the newly created Applewood Crescent.  The works also involve the removal of a local wetland and its compensation elsewhere on the site.  The roads will ultimately be assumed by the City of Vaughan on lands municipally known as 100 Edgeley Boulevard and identified as Blocks 4, 5 and 6 on Registered Plan 65M-2545.

 

NEXT MEETING OF THE EXECUTIVE COMMITTEE #10/18, TO BE HELD ON DECEMBER 14, 2018 AT 9:30 A.M. AT HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN

John MacKenzie, Chief Executive Officer
/am