Executive Committee Meeting
Agenda 

Meeting #:#10/19
Date:
Time:
-
Location:
HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN
Members:
  • Chair Jennifer Innis
  • Vice-Chair Jack Heath
  • Paul Ainslie
  • Ronald Chopowick
  • Dipika Damerla
  • Joanne Dies
  • Jennifer Drake
  • Paula Fletcher
  • Gordon Highet
  • Linda Jackson
  • Cynthia Lai
  • Anthony Perruzza

Flood Plain and Conservation Component, Etobicoke Creek Watershed Metro Ontario Real Estate Limited (CFN 61286)

Flood Plain and Conservation Component, Etobicoke Creek Watershed Peel District School Board (CFN 62395)

Request from the Regional Municipality of Peel for a conveyance of Toronto and Region Conservation Authority-owned lands required for a daylight triangle (CFN 60417)

Settlement of compensation for lands required for the construction of the extension of Highway 427, City of Vaughan (CFN 51576)

MAJOR PERMIT APPLICATIONS 10.1 - 10.6 – REGULAR – FOR APPROVAL

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area, extensive modifications to the landscape, major infrastructure projects, applications requiring specific conditions and permissions that extend beyond two years.

CITY OF BRAMPTON

To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere between Humberwest Parkway and Goreway Drive as part of the Cottrelle Boulevard extension, in the City of Brampton, Humber River Watershed, as located on property owned by and being acquired by the City of Brampton. The purpose is to construct Cottrelle Boulevard between Humberwest Parkway and Goreway Drive. This work has been divided into 4 separate permit applications (CFN 43232, 43233, 43234, 43235). This application (CFN 43232) covers the pre-loading (filling) requirements within the regulated area at Tributary A, located east of Humberwest Parkway. The Redside Dace construction timing window will be applied to this work, unless otherwise specified in writing by the Ministry of the Environment, Conservation and Parks.

To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, interfere with a wetland and alter a watercourse between Humberwest Parkway and Goreway Drive as part of the Cottrelle Boulevard extension, in the City of Brampton, Humber River Watershed, as located on property owned by the City of Brampton and the Toronto and Region Conservation Authority. The purpose is to construct Cottrelle Boulevard between Humberwest Parkway and Goreway Drive. This work has been divided into 4 separate permit applications (CFN 43232, 43233, 43234, 43235). This application (CFN 43233) covers the pre-loading (filling) requirements within the regulated area at the West Humber River, located west of Goreway Drive. The Redside Dace construction timing window will be applied to this work, unless otherwise specified in writing by the Ministry of the Environment, Conservation and Parks.

To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse as part of the Cottrelle Boulevard extension, in the City of Brampton, Humber River Watershed, as located on property owned by the City of Brampton and being acquired by the City of Brampton. The purpose is to construct Cottrelle Boulevard between Humberwest Parkway and Goreway Drive. This work has been divided into 4 separate permit applications (CFN 43232, 43233, 43234, 43235). This application (CFN 43234) covers the final construction of Cottrelle Boulevard within the regulated area at Tributary A, located east of Humberwest Parkway. The Redside Dace construction timing window will be applied to this work, unless otherwise specified in writing by the Ministry of the Environment, Conservation and Parks.

To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse as part of the Cottrelle Boulevard extension, in the City of Brampton, Humber River Watershed, as located on property owned by and being acquired by the City of Brampton. The purpose is to construct Cottrelle Boulevard between Humberwest Parkway and Goreway Drive. This work has been divided into 4 separate permit applications (CFN 43232, 43233, 43234, 43235). This application (CFN 43235) covers the final construction of Cottrelle Boulevard within the regulated area at the West Humber River, located west of Goreway Drive. The Redside Dace construction timing window will be applied to this work, unless otherwise specified in writing by the Ministry of the Environment, Conservation and Parks.

CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)

To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material originating on the site or elsewhere, and alter a watercourse within Duncan Creek, located between Steeles Avenue East and McNicoll Avenue, in the City of Toronto (North York Community Council Area), Don River Watershed as located on property owned by the City of Toronto. The purpose is to undertake Phases 2 and 3 of the Duncan Creek Master Plan channel restoration works, located between Steeles Avenue East and McNicoll Avenue, in the City of Toronto. The warm water construction timing window will apply to this project.

CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)

To construct - reconstruct - erect or place a building or structure, site grade, temporarily or permanently place - dump or remove any material - originating on the site or elsewhere, alter a watercourse on Highland Creek Valley Segment 8 downstream of Ellesmere Road near Morningside Avenue, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by City of Toronto. The purpose is to Complete restoration work within East Highland Creek Valley Segment 8. The coldwater construction timing window of September 16th to June 15th applies to this project.

Delegated Permits are processed by Development and Engineering Services Division staff, authorized by designated staff appointed as Enforcement Officers by the Board of Directors and received monthly by the Executive Committee. Delegated permits are categorized as standard, routine infrastructure works, emergency infrastructure works, minor works and permits after the fact/resolution of violations. Standard permits are non-complex permissions consistent with TRCA approved policies and procedures and issued for a time period of two years or less.

STANDARD DELEGATED PERMITS – STAFF APPROVED AND ISSUED (Page 75)

PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS – STAFF APPROVED AND ISSUED (Page 94)

MINOR WORKS LETTER OF APPROVAL – STAFF APPROVED AND ISSUED (Page 110)

PERMITS AFTER THE FACT / RESOLUTION OF VIOLATIONS – STAFF APPROVED AND ISSUED (Page 114)

 

NEXT MEETING OF THE EXECUTIVE COMMITTEE #11/19, TO BE HELD ON FEBRUARY 7, 2020 AT 9:30 A.M. AT HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN

John MacKenzie, Chief Executive Officer
 
/am